
Construction and demolition waste removal in Tallinn and Harjumaa
From minor renovations to major site clearance. We remove builder's waste quickly and properly.
Make room in the apartment
Official Disposal Certificate
Response within 2 hours
Fast response in Tallinn and Harju County
Site at a standstill? Waste in the way?
When the container is full or you need a quick dispatch, we often respond the same day. Your builders do not have to stand idle.
What is your situation?
Every situation is different - we have a solution for all of them
Basement
Low ceiling and heavy lifting. Container stays far, van comes to the door.
Basement and heavy fill
⚠ SITUATION
Low basement and wet fill (sand, clay, concrete). Narrow yard where a large truck doesn't fit.
✓ SOLUTION
GOLOG van's small turning radius allows reversing straight to the door. We load heavy fill directly from the basement.
★ ADVANTAGE
Fast access and immediate removal. No exhausting carrying from yard to street.
from 150€
Transport + loading + disposal
Apartment renovation
Vertical logistics and time saving.
5th floor no elevator
⚠ SITUATION
Demolition waste: wool, wood, plasterboard and shattered tiles. 5th floor, no elevator. Storing trash in stairwell is forbidden.
✓ SOLUTION
Door to door service. Our team brings waste down from floors and loads into van in an hour.
★ ADVANTAGE
Logistical freedom. Yard not blocked. We come, load, and leave.
from 120€
Transport + loading + disposal
Private house
We save the yard and lawn.
Private house
⚠ SITUATION
Drywall, styrofoam, wool (volume waste). Saving yard stones and lawn because heavy truck doesn't have to drive in.
✓ SOLUTION
Light van saves your yard. We take volume waste at once to the official landfill.
★ ADVANTAGE
Property safety. Site gets clean without damaging yard or lawn.
from 120€
Transport + loading + disposal
How pricing is formed
What determines the price?
Sorting determines the cost and speed.
The better the waste is separated on site, the lower the disposal cost.
Clean material
Concrete, stone, wood
- • 100% recyclable
- • Lowest disposal rate
Most affordable
Mixed renovation debris
Plasterboard, wood, metal mixed
- • Requires sorting
- • Average price level
Standard price
Highly mixed
Plastic, wool, styrofoam, etc.
- • Limited sorting
- • Often goes to incineration
Higher cost
Bathroom renovation (van)
Here you can see from real jobs how the cost is distributed.
Example 1
Bathroom renovation (van)
* More difficult access means more labor.
Example 2
Full apartment renovation (container)
* If the container is used longer or the distance is greater, the price may change.
B2B cooperation
Continuous site service
Transparent pricing (weight vs volume)
For construction waste, the most important factor is the material weight. Concrete is significantly heavier than drywall, and at the Silluse 1 waste facility the disposal fee depends exactly on the material weight (155€ + VAT/t for mixed construction waste).
We do not add surprise fees for missing elevators or a fifth floor. You pay a fixed price only for the work performed and the actual material.
- • Sorted minerals (clean concrete) → lower disposal cost
- • Mixed construction waste with insulation → higher disposal cost
No unpleasant surprises and no so-called "creeping" stair fees.
Do you recognize your situation?
Examples of real situations:
When is a van the right choice?
Concrete, tiles and drywall. Heavy volume that is not safe to haul with a regular passenger car.
When to order a container?
Old wooden roof. We load it and the wood is directed to bioenergy.
Demolition work and masonry
Brick, clean plaster, and concrete blocks. We take them straight to crushing, where they become clean, full-value road fill.
What counts as construction waste?
Stones and Concrete
- • Clean concrete without rebar
- • Bricks and ceramics
- • Blocks and masonry
- • Floor leveling compounds
Circular economy: These fractions are crushed and used in road construction.
Wood
- • Clean wood
- • Panels and laminate
- • Doors, windows, and frames
- • Wood and boarding
Circular economy: Clean wood is directed to biomass. Drywall requires separate handling.
Mixed construction waste
- • Regular renovation bags
- • Glass wool and insulation
- • Old sanitary equipment
- • Film, plastic, and packaging
All loads go through post-sorting at the Silluse 1 waste facility according to waste code 170904.
Who is responsible?
👉By law, the waste holder is responsible - meaning you.
❌ Unchecked service
- • Actual waste destination unknown
- • Documentation missing
- • Responsibility remains with you
- • Possible fine up to 3200 €
✅ GOLOG
- ✓ Waste permit JÄ/334804
- ✓ Disposal certificate for every order
- ✓ Waste reaches official treatment
- ✓ Responsibility documented (17 09 04 and related codes)
Waste codes and certificates
All mixed construction and demolition waste (code 17 09 04) and heavy mineral materials (code 17 01 01) are transported directly to the Silluse 1 waste facility. We do not use middlemen or random helpers.
For every load, we issue an official disposal certificate based on Environmental Board permit JÄ/334804. This document confirms that your waste has been handled legally. It is required both when handing over a construction site and during apartment association audits.
Process
How does it work?
Ordering is easy - from estimate to disposal.
Step 1
Describe the situation
Address, floor, access.
👉 We immediately understand the volume and complexity of the work
Step 2
Get an exact quote
We reply within a workday. The price depends on the material and access conditions.
👉 No surprises
Step 3
We pick it up
Van or container. Carrying down from upper floors when needed.
👉 Fast and tidy execution
Step 4
Official disposal
We issue a disposal certificate.
👉 Everything is documented
We respond to inquiries quickly on business days
Execution: same or next day
Describe your situation and we'll handle it
- ✓ Clear price before work begins
- ✓ Proper documentation
- ✓ Fast execution
Or call: +372 5350 4299
Where does your waste really go?
👉We see your trash's journey from start to finish.
Frequently asked questions
Does the construction waste removal price include loading?
Yes. GOLOG's service includes transport, loading, and disposal.The waste is taken to the official Silluse 1 waste facility and handled according to requirements.
Do you also remove demolition waste?
Yes. We accept both sorted and mixed construction and demolition waste.The material is directed to the proper handling or sorting stream based on its composition.
Can a container be delivered to a private house?
Yes. We deliver the container directly to the site (15-30 m³) and collect it at the agreed time.The service is suitable for both private houses and construction sites.
Can I slowly put renovation waste into household bins?
Absolutely not.Heavy stones and construction dust damage rental containers, and collection trucks may refuse to empty them. Building managers and municipal authorities can fine illegal dumping up to 3200€. GOLOG provides documented legal disposal.
Why is construction waste removal more expensive than regular waste?
Construction and demolition waste requires separate handling.The disposal fee depends on the material and can reach about 108 €/t for mixed waste. The price comes from the handling process, not from guesswork.
Do you issue an official disposal certificate?
Yes. We issue a disposal certificate with weighing data for every order.It is a necessary document when handing over construction sites.
Who is responsible for construction waste: the carrier or the client?
By law, the waste holder is responsible for the waste.That is why handling must be documented and carried out by a company with an official permit.